Sample Inspection Process – Bearing Dimension Check

2026-07-07 14:28
10

Sample Inspection Process – Bearing Dimension Check



When we receive a sample from a client, the first step is always measurement and documentation.


Here's our standard process:

  • Dimensions checked: inner diameter, outer diameter, width

  • Three-point measurement for each dimension

  • Recorded with digital caliper (0.01mm resolution)

  • Photographic documentation for traceability


Every shipment starts with measuring the sample correctly. That's how we ensure consistency from sample to mass production.

Sample, package, and record sheet – ready for inspection

样品测量 3.jpg

Dimension check in process – inner diameter measurement.


高清封面.jpg

Digital reading recorded at 0.01mm precision.

测量.jpg

Cross-checking outer diameter for consistency.


样品测量.jpg